Quote:
Originally Posted by Fire Me Boy!
There are shutouts on each of the beds, plus at the source.
Per section, 4 2x6x16 @ $11.15, 8 stones at $2,56 apiece, and roughly 28 cu. ft. soil at about $1.60/bag.
Vertically into the ground.
|
Thanks man. That's a pretty sweet setup.
Did you use treated lumber? How deep did you drive the rebar in?